US Bridges

SR-429 NB over Fgt Easement

Good

Orange County, Florida · 3.2MILES South of SR-46 · Structure no. 750876

Built
2017
8 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
106 ft
1 main span
Daily traffic
5,200
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-429 NB over Fgt Easement is a prestressed concrete box beam or girders - single or spread carrying SR-429 NB over Fgt Easement in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,200 vehicles a day, roughly 11% of them trucks, projected to reach 9,022 by 2044. The structure is 106 ft (32.4 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-429 NB
CrossesFgt Easement
Location3.2MILES South of SR-46
StateFlorida
Coordinates28.77592, -81.53219
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.4 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length106 ft (32.4 m)
Longest span106 ft (32.4 m)
Deck width47 ft (14.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,200 (2022)
Projected traffic9,022 by 2044
Trucks11%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-429 NB over Fgt Easement built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR-429 NB over Fgt Easement in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR-429 NB over Fgt Easement carry?

About 5,200 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is SR-429 NB over Fgt Easement?

The structure is 106 ft (32.4 m) long with a longest span of 106 ft (32.4 m) and a deck 47 ft wide.

Who owns SR-429 NB over Fgt Easement?

It is owned by the State Toll Authority.