SR-50 WB over Econlockhatchee River
GoodOrange County, Florida · SR-50 WB over Econ River · Structure no. 750848
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 348 ft
- 4 main spans
- Daily traffic
- 19,750
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-50 WB over Econlockhatchee River is a prestressed concrete stringer/multi-beam or girder carrying SR-50 WB over Econlockhatchee River in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,750 vehicles a day, roughly 7% of them trucks, projected to reach 34,266 by 2044. The structure is 348 ft (106.1 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-50 WB over Econlockhatchee River built?
It was built in 2017, making it 8 years old in 2025.
What condition is SR-50 WB over Econlockhatchee River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does SR-50 WB over Econlockhatchee River carry?
About 19,750 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is SR-50 WB over Econlockhatchee River?
The structure is 348 ft (106.1 m) long with a longest span of 87 ft (26.4 m) and a deck 61 ft wide.
Who owns SR-50 WB over Econlockhatchee River?
It is owned by the State Highway Agency.