US Bridges

SR-429 NB over W Kelly Park RD

Good

Orange County, Florida · 4.3 MI N of US-441 · Structure no. 750845

Built
2017
8 years old
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Single or Spread
Steel
Length
161 ft
1 main span
Daily traffic
4,700
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-429 NB over W Kelly Park RD is a steel box beam or girders - single or spread carrying SR-429 NB over W Kelly Park RD in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,700 vehicles a day, roughly 6% of them trucks, projected to reach 8,154 by 2044. The structure is 161 ft (49.1 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-429 NB
CrossesW Kelly Park RD
Location4.3 MI N of US-441
RouteState Highway 429
StateFlorida
Coordinates28.7565, -81.56686
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length161 ft (49.1 m)
Longest span161 ft (49.1 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,700 (2022)
Projected traffic8,154 by 2044
Trucks6%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-429 NB over W Kelly Park RD built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR-429 NB over W Kelly Park RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does SR-429 NB over W Kelly Park RD carry?

About 4,700 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SR-429 NB over W Kelly Park RD?

The structure is 161 ft (49.1 m) long with a longest span of 161 ft (49.1 m) and a deck 55 ft wide.

Who owns SR-429 NB over W Kelly Park RD?

It is owned by the State Toll Authority.