US Bridges

SR-482 over Shingle Creek

Good

Orange County, Florida · SR-482 - Shingle Creek · Structure no. 750809

Built
2021
4 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
300 ft
3 main spans
Daily traffic
46,000
2022 count
Owner
State
State Highway Agency

About this bridge

SR-482 over Shingle Creek is a prestressed concrete stringer/multi-beam or girder carrying SR-482 over Shingle Creek in Orange County, Florida. It was built in 2021, so it is 4 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 46,000 vehicles a day, roughly 5% of them trucks, projected to reach 79,810 by 2044. The structure is 300 ft (91.4 m) long and 139 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSR-482
CrossesShingle Creek
LocationSR-482 - Shingle Creek
RouteState Highway 482
StateFlorida
Coordinates28.45028, -81.43444
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.5 US tons
Inventory rating39.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length300 ft (91.4 m)
Longest span100 ft (30.5 m)
Deck width139 ft (42.4 m)
Roadway width112 ft (34.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic46,000 (2022)
Projected traffic79,810 by 2044
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-482 over Shingle Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is SR-482 over Shingle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does SR-482 over Shingle Creek carry?

About 46,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is SR-482 over Shingle Creek?

The structure is 300 ft (91.4 m) long with a longest span of 100 ft (30.5 m) and a deck 139 ft wide.

Who owns SR-482 over Shingle Creek?

It is owned by the State Highway Agency.