US Bridges

I-4 WB over Kaley ST & Ramp E1-KM

Good

Orange County, Florida · WB 1MI South of SR 408 · Structure no. 750761

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
246 ft
2 main spans
Daily traffic
60,250
2021 count
Owner
State
State Highway Agency

About this bridge

I-4 WB over Kaley ST & Ramp E1-KM is a prestressed concrete stringer/multi-beam or girder carrying I-4 WB over Kaley ST & Ramp E1-KM in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60,250 vehicles a day, roughly 7% of them trucks, projected to reach 104,534 by 2041. The structure is 246 ft (75.1 m) long and 156 ft wide. If it were closed, the detour would be 4.3 mi (7 km).

CarriesI-4 WB
CrossesKaley ST & Ramp E1-KM
LocationWB 1MI South of SR 408
RouteInterstate 4
StateFlorida
Coordinates28.52031, -81.38678
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.1 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length246 ft (75.1 m)
Longest span133 ft (40.5 m)
Deck width156 ft (47.4 m)
Roadway width146 ft (44.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic60,250 (2021)
Projected traffic104,534 by 2041
Trucks7%
Lanes on structure6
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed4.3 mi (7 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-4 WB over Kaley ST & Ramp E1-KM built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-4 WB over Kaley ST & Ramp E1-KM in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does I-4 WB over Kaley ST & Ramp E1-KM carry?

About 60,250 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is I-4 WB over Kaley ST & Ramp E1-KM?

The structure is 246 ft (75.1 m) long with a longest span of 133 ft (40.5 m) and a deck 156 ft wide.

Who owns I-4 WB over Kaley ST & Ramp E1-KM?

It is owned by the State Highway Agency.