I-4 WB to WB 408 over I-4
GoodOrange County, Florida · WB I4 Ramp to WB 408 · Structure no. 750749
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Steel Continuous
- Length
- 1,711 ft
- 8 main spans
- Daily traffic
- 2,900
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-4 WB to WB 408 over I-4 is a steel continuous box beam or girders - multiple carrying I-4 WB to WB 408 over I-4 in Orange County, Florida. It was built in 2019, so it is 6 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,900 vehicles a day, roughly 11% of them trucks, projected to reach 34,500 by 2042. The structure is 1,711 ft (521.4 m) long and 32 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-4 WB to WB 408 over I-4 built?
It was built in 2019, making it 6 years old in 2025.
What condition is I-4 WB to WB 408 over I-4 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does I-4 WB to WB 408 over I-4 carry?
About 2,900 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is I-4 WB to WB 408 over I-4?
The structure is 1,711 ft (521.4 m) long with a longest span of 237 ft (72.1 m) and a deck 32 ft wide.
Who owns I-4 WB to WB 408 over I-4?
It is owned by the State Highway Agency.