US Bridges

Maitland Blvd Ext. over SR-414

Good

Orange County, Florida · SR-429 and SR-414 · Structure no. 750724

Built
2012
13 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
302 ft
2 main spans
Daily traffic
5,900
2025 count
Owner
Toll Authority
State Toll Authority

About this bridge

Maitland Blvd Ext. over SR-414 is a steel continuous box beam or girders - single or spread carrying Maitland Blvd Ext. over SR-414 in Orange County, Florida. It was built in 2012, so it is 13 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,900 vehicles a day, roughly 6% of them trucks, projected to reach 10,237 by 2047. The structure is 302 ft (92 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMaitland Blvd Ext.
CrossesSR-414
LocationSR-429 and SR-414
StateFlorida
Coordinates28.653, -81.53014
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating84.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length302 ft (92 m)
Longest span154 ft (46.8 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic5,900 (2025)
Projected traffic10,237 by 2047
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Maitland Blvd Ext. over SR-414 built?

It was built in 2012, making it 13 years old in 2025.

What condition is Maitland Blvd Ext. over SR-414 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Maitland Blvd Ext. over SR-414 carry?

About 5,900 vehicles per day (2025 count), of which roughly 6% are trucks.

How long is Maitland Blvd Ext. over SR-414?

The structure is 302 ft (92 m) long with a longest span of 154 ft (46.8 m) and a deck 36 ft wide.

Who owns Maitland Blvd Ext. over SR-414?

It is owned by the State Toll Authority.