US Bridges

SR528 EB Rmp 3.083 over CR 423 (jyp)

Good

Orange County, Florida · Over CR 423 (jyp) · Structure no. 750629

Built
2018
7 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
293 ft
4 main spans
Daily traffic
4,000
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR528 EB Rmp 3.083 over CR 423 (jyp) is a prestressed concrete stringer/multi-beam or girder carrying SR528 EB Rmp 3.083 over CR 423 (jyp) in Orange County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,000 vehicles a day, roughly 11% of them trucks, projected to reach 6,940 by 2042. The structure is 293 ft (89.4 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR528 EB Rmp 3.083
CrossesCR 423 (jyp)
LocationOver CR 423 (jyp)
RouteState Highway 528
StateFlorida
Coordinates28.42163, -81.42282
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating68.2 US tons
Inventory rating42.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length293 ft (89.4 m)
Longest span94 ft (28.7 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic4,000 (2022)
Projected traffic6,940 by 2042
Trucks11%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR528 EB Rmp 3.083 over CR 423 (jyp) built?

It was built in 2018, making it 7 years old in 2025.

What condition is SR528 EB Rmp 3.083 over CR 423 (jyp) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does SR528 EB Rmp 3.083 over CR 423 (jyp) carry?

About 4,000 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is SR528 EB Rmp 3.083 over CR 423 (jyp)?

The structure is 293 ft (89.4 m) long with a longest span of 94 ft (28.7 m) and a deck 30 ft wide.

Who owns SR528 EB Rmp 3.083 over CR 423 (jyp)?

It is owned by the State Toll Authority.