SR528 EB Rmp 3.083 over CR 423 (jyp)
GoodOrange County, Florida · Over CR 423 (jyp) · Structure no. 750629
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 293 ft
- 4 main spans
- Daily traffic
- 4,000
- 2022 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR528 EB Rmp 3.083 over CR 423 (jyp) is a prestressed concrete stringer/multi-beam or girder carrying SR528 EB Rmp 3.083 over CR 423 (jyp) in Orange County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,000 vehicles a day, roughly 11% of them trucks, projected to reach 6,940 by 2042. The structure is 293 ft (89.4 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR528 EB Rmp 3.083 over CR 423 (jyp) built?
It was built in 2018, making it 7 years old in 2025.
What condition is SR528 EB Rmp 3.083 over CR 423 (jyp) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does SR528 EB Rmp 3.083 over CR 423 (jyp) carry?
About 4,000 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is SR528 EB Rmp 3.083 over CR 423 (jyp)?
The structure is 293 ft (89.4 m) long with a longest span of 94 ft (28.7 m) and a deck 30 ft wide.
Who owns SR528 EB Rmp 3.083 over CR 423 (jyp)?
It is owned by the State Toll Authority.