US Bridges

SR-417 NB Ramp B1 over O.U.C.R.R.

Good

Orange County, Florida · 0.2 MI S of Moss Park Rd. · Structure no. 750576

Built
2009
16 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
338 ft
3 main spans
Daily traffic
1,700
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-417 NB Ramp B1 over O.U.C.R.R. is a prestressed concrete stringer/multi-beam or girder carrying SR-417 NB Ramp B1 over O.U.C.R.R. in Orange County, Florida. It was built in 2009, so it is 16 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,700 vehicles a day, roughly 6% of them trucks, projected to reach 2,950 by 2044. The structure is 338 ft (103 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR-417 NB Ramp B1
CrossesO.U.C.R.R.
Location0.2 MI S of Moss Park Rd.
RouteState Highway 417
StateFlorida
Coordinates28.40956, -81.23006
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating53.6 US tons
Inventory rating48.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length338 ft (103 m)
Longest span117 ft (35.8 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic1,700 (2022)
Projected traffic2,950 by 2044
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-417 NB Ramp B1 over O.U.C.R.R. built?

It was built in 2009, making it 16 years old in 2025.

What condition is SR-417 NB Ramp B1 over O.U.C.R.R. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR-417 NB Ramp B1 over O.U.C.R.R. carry?

About 1,700 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SR-417 NB Ramp B1 over O.U.C.R.R.?

The structure is 338 ft (103 m) long with a longest span of 117 ft (35.8 m) and a deck 30 ft wide.

Who owns SR-417 NB Ramp B1 over O.U.C.R.R.?

It is owned by the State Toll Authority.