US Bridges

NB C-D Road Ramp over University Blvd.

Good

Orange County, Florida · SR-417 Nb-University Blvd · Structure no. 750557

Built
2002
23 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
137 ft
1 main span
Daily traffic
3,400
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

NB C-D Road Ramp over University Blvd. is a steel stringer/multi-beam or girder carrying NB C-D Road Ramp over University Blvd. in Orange County, Florida. It was built in 2002, so it is 23 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,400 vehicles a day, roughly 6% of them trucks, projected to reach 5,899 by 2044. The structure is 137 ft (41.9 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNB C-D Road Ramp
CrossesUniversity Blvd.
LocationSR-417 Nb-University Blvd
RouteState Highway 417
StateFlorida
Coordinates28.59737, -81.24961
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.3 US tons
Inventory rating26 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length137 ft (41.9 m)
Longest span135 ft (41.3 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,400 (2022)
Projected traffic5,899 by 2044
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB C-D Road Ramp over University Blvd. built?

It was built in 2002, making it 23 years old in 2025.

What condition is NB C-D Road Ramp over University Blvd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does NB C-D Road Ramp over University Blvd. carry?

About 3,400 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is NB C-D Road Ramp over University Blvd.?

The structure is 137 ft (41.9 m) long with a longest span of 135 ft (41.3 m) and a deck 43 ft wide.

Who owns NB C-D Road Ramp over University Blvd.?

It is owned by the State Toll Authority.