US Bridges

Goldenrod Rd. over SR-528

Fair

Orange County, Florida · 1.1 MI S of Lee Vista Blv · Structure no. 750512

Built
2002
23 years old
Condition
Fair
inspected January 2025
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
266 ft
2 main spans
Daily traffic
11,600
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Goldenrod Rd. over SR-528 is a prestressed concrete box beam or girders - single or spread carrying Goldenrod Rd. over SR-528 in Orange County, Florida. It was built in 2002, so it is 23 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,600 vehicles a day, roughly 5% of them trucks, projected to reach 20,126 by 2045. The structure is 266 ft (81 m) long and 167 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesGoldenrod Rd.
CrossesSR-528
Location1.1 MI S of Lee Vista Blv
RouteState Highway 551
StateFlorida
Coordinates28.44928, -81.28669
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating62.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length266 ft (81 m)
Longest span145 ft (44.3 m)
Deck width167 ft (50.8 m)
Roadway width161 ft (49.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,600 (2023)
Projected traffic20,126 by 2045
Trucks5%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.8 mi (11 km)
TollOn a toll road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Goldenrod Rd. over SR-528 built?

It was built in 2002, making it 23 years old in 2025.

What condition is Goldenrod Rd. over SR-528 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Goldenrod Rd. over SR-528 carry?

About 11,600 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Goldenrod Rd. over SR-528?

The structure is 266 ft (81 m) long with a longest span of 145 ft (44.3 m) and a deck 167 ft wide.

Who owns Goldenrod Rd. over SR-528?

It is owned by the State Toll Authority.