US Bridges

Ramp C over Palm Drive

Good

Orange County, Florida · 1.9 Mi. North of SR-50 · Structure no. 750509

Built
2000
25 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
77 ft
1 main span
Daily traffic
2,600
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Ramp C over Palm Drive is a prestressed concrete stringer/multi-beam or girder carrying Ramp C over Palm Drive in Orange County, Florida. It was built in 2000, so it is 25 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,600 vehicles a day, roughly 5% of them trucks, projected to reach 4,511 by 2045. The structure is 77 ft (23.5 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRamp C
CrossesPalm Drive
Location1.9 Mi. North of SR-50
RouteState Highway 429
StateFlorida
Coordinates28.57694, -81.55744
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating52 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length77 ft (23.5 m)
Longest span75 ft (22.9 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,600 (2023)
Projected traffic4,511 by 2045
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp C over Palm Drive built?

It was built in 2000, making it 25 years old in 2025.

What condition is Ramp C over Palm Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Ramp C over Palm Drive carry?

About 2,600 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Ramp C over Palm Drive?

The structure is 77 ft (23.5 m) long with a longest span of 75 ft (22.9 m) and a deck 30 ft wide.

Who owns Ramp C over Palm Drive?

It is owned by the State Toll Authority.