US Bridges

SR-429 SB over West Orange Trail

Good

Orange County, Florida · 5.7 Mi. South of US-441 · Structure no. 750492

Built
2000
25 years old, rebuilt 2024
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
94 ft
1 main span
Daily traffic
34,750
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-429 SB over West Orange Trail is a prestressed concrete stringer/multi-beam or girder carrying SR-429 SB over West Orange Trail in Orange County, Florida. It was built in 2000 and reconstructed in 2024, so it is 25 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,750 vehicles a day, roughly 5% of them trucks, projected to reach 60,292 by 2045. The structure is 94 ft (28.7 m) long and 79 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR-429 SB
CrossesWest Orange Trail
Location5.7 Mi. South of US-441
RouteState Highway 429
StateFlorida
Coordinates28.61044, -81.53726
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length94 ft (28.7 m)
Longest span90 ft (27.5 m)
Deck width79 ft (24.2 m)
Roadway width76 ft (23.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,750 (2023)
Projected traffic60,292 by 2045
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-429 SB over West Orange Trail built?

It was built in 2000, making it 25 years old in 2025. It was reconstructed in 2024.

What condition is SR-429 SB over West Orange Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR-429 SB over West Orange Trail carry?

About 34,750 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SR-429 SB over West Orange Trail?

The structure is 94 ft (28.7 m) long with a longest span of 90 ft (27.5 m) and a deck 79 ft wide.

Who owns SR-429 SB over West Orange Trail?

It is owned by the State Toll Authority.