SR-429 NB over Northwest Ditch
GoodOrange County, Florida · 2.9 Miles North of SR-50 · Structure no. 750417
- Built
- 2000
- 25 years old, rebuilt 2023
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 112 ft
- 1 main span
- Daily traffic
- 42,250
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR-429 NB over Northwest Ditch is a prestressed concrete stringer/multi-beam or girder carrying SR-429 NB over Northwest Ditch in Orange County, Florida. It was built in 2000 and reconstructed in 2023, so it is 25 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 42,250 vehicles a day, roughly 5% of them trucks, projected to reach 73,304 by 2045. The structure is 112 ft (34 m) long and 89 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-429 NB over Northwest Ditch built?
It was built in 2000, making it 25 years old in 2025. It was reconstructed in 2023.
What condition is SR-429 NB over Northwest Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SR-429 NB over Northwest Ditch carry?
About 42,250 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is SR-429 NB over Northwest Ditch?
The structure is 112 ft (34 m) long with a longest span of 110 ft (33.4 m) and a deck 89 ft wide.
Who owns SR-429 NB over Northwest Ditch?
It is owned by the State Toll Authority.