US Bridges

SR-408 WB Ramp over Citrus Oaks Ave

Good

Orange County, Florida · SR-408 Wb-Citrus Oaks Ave · Structure no. 750391

Built
1990
35 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
66 ft
1 main span
Daily traffic
5,600
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-408 WB Ramp over Citrus Oaks Ave is a prestressed concrete stringer/multi-beam or girder carrying SR-408 WB Ramp over Citrus Oaks Ave in Orange County, Florida. It was built in 1990, so it is 35 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,600 vehicles a day, roughly 4% of them trucks, projected to reach 9,716 by 2045. The structure is 66 ft (20.1 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-408 WB Ramp
CrossesCitrus Oaks Ave
LocationSR-408 Wb-Citrus Oaks Ave
RouteState Highway 408
StateFlorida
Coordinates28.54594, -81.51802
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.8 US tons
Inventory rating48 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length66 ft (20.1 m)
Longest span64 ft (19.5 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,600 (2023)
Projected traffic9,716 by 2045
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-408 WB Ramp over Citrus Oaks Ave built?

It was built in 1990, making it 35 years old in 2025.

What condition is SR-408 WB Ramp over Citrus Oaks Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR-408 WB Ramp over Citrus Oaks Ave carry?

About 5,600 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is SR-408 WB Ramp over Citrus Oaks Ave?

The structure is 66 ft (20.1 m) long with a longest span of 64 ft (19.5 m) and a deck 43 ft wide.

Who owns SR-408 WB Ramp over Citrus Oaks Ave?

It is owned by the State Toll Authority.