US Bridges

SR-408 over Orange Blossom Trail

Good

Orange County, Florida · SR-408 - US-441 · Structure no. 750238

Built
1973
52 years old, rebuilt 2020
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
195 ft
4 main spans
Daily traffic
115,500
2022 count
Owner
State
State Highway Agency

About this bridge

SR-408 over Orange Blossom Trail is a prestressed concrete stringer/multi-beam or girder carrying SR-408 over Orange Blossom Trail in Orange County, Florida. It was built in 1973 and reconstructed in 2020, so it is 52 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 115,500 vehicles a day, roughly 3% of them trucks, projected to reach 200,392 by 2044. The structure is 195 ft (59.3 m) long and 129 ft wide.

CarriesSR-408
CrossesOrange Blossom Trail
LocationSR-408 - US-441
RouteState Highway 408
StateFlorida
Coordinates28.53514, -81.39716
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating37.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length195 ft (59.3 m)
Longest span60 ft (18.3 m)
Deck width129 ft (39.3 m)
Roadway width129 ft (39.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic115,500 (2022)
Projected traffic200,392 by 2044
Trucks3%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-408 over Orange Blossom Trail built?

It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2020.

What condition is SR-408 over Orange Blossom Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR-408 over Orange Blossom Trail carry?

About 115,500 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is SR-408 over Orange Blossom Trail?

The structure is 195 ft (59.3 m) long with a longest span of 60 ft (18.3 m) and a deck 129 ft wide.

Who owns SR-408 over Orange Blossom Trail?

It is owned by the State Highway Agency.