US Bridges

SR 528 EB 7.2 over CR 527 Orange Ave

Good

Orange County, Florida · 7.2 MI East of I-4 · Structure no. 750224

Built
1973
52 years old, rebuilt 2009
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
176 ft
2 main spans
Daily traffic
49,650
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 528 EB 7.2 over CR 527 Orange Ave is a prestressed concrete stringer/multi-beam or girder carrying SR 528 EB 7.2 over CR 527 Orange Ave in Orange County, Florida. It was built in 1973 and reconstructed in 2009, so it is 52 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49,650 vehicles a day, roughly 11% of them trucks, projected to reach 86,143 by 2042. The structure is 176 ft (53.6 m) long and 71 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 528 EB 7.2
CrossesCR 527 Orange Ave
Location7.2 MI East of I-4
RouteState Highway 528
StateFlorida
Coordinates28.44583, -81.36494
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.1 US tons
Inventory rating49.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length176 ft (53.6 m)
Longest span92 ft (27.9 m)
Deck width71 ft (21.7 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49,650 (2022)
Projected traffic86,143 by 2042
Trucks11%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 528 EB 7.2 over CR 527 Orange Ave built?

It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2009.

What condition is SR 528 EB 7.2 over CR 527 Orange Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR 528 EB 7.2 over CR 527 Orange Ave carry?

About 49,650 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is SR 528 EB 7.2 over CR 527 Orange Ave?

The structure is 176 ft (53.6 m) long with a longest span of 92 ft (27.9 m) and a deck 71 ft wide.

Who owns SR 528 EB 7.2 over CR 527 Orange Ave?

It is owned by the State Toll Authority.