US Bridges

SR-408 EB over Church Street

Fair

Orange County, Florida · SR-408 EB - Church ST · Structure no. 750220

Built
1973
52 years old, rebuilt 2000
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
262 ft
4 main spans
Daily traffic
57,500
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-408 EB over Church Street is a prestressed concrete stringer/multi-beam or girder carrying SR-408 EB over Church Street in Orange County, Florida. It was built in 1973 and reconstructed in 2000, so it is 52 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 57,500 vehicles a day, roughly 3% of them trucks, projected to reach 99,762 by 2044. The structure is 262 ft (80 m) long and 99 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR-408 EB
CrossesChurch Street
LocationSR-408 EB - Church ST
RouteState Highway 408
StateFlorida
Coordinates28.54005, -81.41068
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.1 US tons
Inventory rating32.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length262 ft (80 m)
Longest span75 ft (23 m)
Deck width99 ft (30.3 m)
Roadway width76 ft (23.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic57,500 (2022)
Projected traffic99,762 by 2044
Trucks3%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-408 EB over Church Street built?

It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2000.

What condition is SR-408 EB over Church Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does SR-408 EB over Church Street carry?

About 57,500 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is SR-408 EB over Church Street?

The structure is 262 ft (80 m) long with a longest span of 75 ft (23 m) and a deck 99 ft wide.

Who owns SR-408 EB over Church Street?

It is owned by the State Toll Authority.