SR 528 WB 4.6 over US 441 US 17 US 92
FairOrange County, Florida · 4.75 MI East of I-4 · Structure no. 750093
- Built
- 1973
- 52 years old, rebuilt 2019
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 406 ft
- 5 main spans
- Daily traffic
- 41,900
- 2022 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR 528 WB 4.6 over US 441 US 17 US 92 is a prestressed concrete stringer/multi-beam or girder carrying SR 528 WB 4.6 over US 441 US 17 US 92 in Orange County, Florida. It was built in 1973 and reconstructed in 2019, so it is 52 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 41,900 vehicles a day, roughly 11% of them trucks, projected to reach 72,696 by 2044. The structure is 406 ft (123.9 m) long and 91 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 528 WB 4.6 over US 441 US 17 US 92 built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2019.
What condition is SR 528 WB 4.6 over US 441 US 17 US 92 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does SR 528 WB 4.6 over US 441 US 17 US 92 carry?
About 41,900 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is SR 528 WB 4.6 over US 441 US 17 US 92?
The structure is 406 ft (123.9 m) long with a longest span of 113 ft (34.5 m) and a deck 91 ft wide.
Who owns SR 528 WB 4.6 over US 441 US 17 US 92?
It is owned by the State Toll Authority.