Watson Road over Bogie Channel
FairMonroe County, Florida · 3.5 MI E of SR 5(MM 30.5) · Structure no. 904320
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,238 ft
- 45 main spans
- Daily traffic
- 1,300
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Watson Road over Bogie Channel is a prestressed concrete stringer/multi-beam or girder carrying Watson Road over Bogie Channel in Monroe County, Florida. It was built in 1967, so it is 58 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,300 vehicles a day, roughly 19% of them trucks, projected to reach 1,450 by 2042. The structure is 2,238 ft (682.1 m) long and 34 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Watson Road over Bogie Channel built?
It was built in 1967, making it 58 years old in 2025.
What condition is Watson Road over Bogie Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Watson Road over Bogie Channel carry?
About 1,300 vehicles per day (2020 count), of which roughly 19% are trucks.
How long is Watson Road over Bogie Channel?
The structure is 2,238 ft (682.1 m) long with a longest span of 60 ft (18.3 m) and a deck 34 ft wide.
Who owns Watson Road over Bogie Channel?
It is owned by the County Highway Agency.