NE 19th Avenue over Snake Creek Canal C-9
FairMiami-Dade County, Florida · 800FT. N of NE 163rd St. · Structure no. 877500
- Built
- 1956
- 69 years old, rebuilt 1998
- Condition
- Fair
- inspected November 2024
- Type
- Tee Beam
- Concrete
- Length
- 138 ft
- 6 main spans
- Daily traffic
- 23,735
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
NE 19th Avenue over Snake Creek Canal C-9 is a concrete tee beam carrying NE 19th Avenue over Snake Creek Canal C-9 in Miami-Dade County, Florida. It was built in 1956 and reconstructed in 1998, so it is 69 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,735 vehicles a day, roughly 3% of them trucks, projected to reach 39,196 by 2043. The structure is 138 ft (42.1 m) long and 107 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NE 19th Avenue over Snake Creek Canal C-9 built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1998.
What condition is NE 19th Avenue over Snake Creek Canal C-9 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does NE 19th Avenue over Snake Creek Canal C-9 carry?
About 23,735 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is NE 19th Avenue over Snake Creek Canal C-9?
The structure is 138 ft (42.1 m) long with a longest span of 26 ft (7.9 m) and a deck 107 ft wide.
Who owns NE 19th Avenue over Snake Creek Canal C-9?
It is owned by the City or Municipal Highway Agency.