US Bridges

Surfside Blvd. over Indian Creek

FairPosted for load

Miami-Dade County, Florida · 0.5 Mile West of A1A · Structure no. 876100

Built
1930
95 years old
Condition
Fair
inspected August 2024
Type
Tee Beam
Concrete Continuous
Length
360 ft
13 main spans
Daily traffic
1,040
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Surfside Blvd. over Indian Creek is a concrete continuous tee beam carrying Surfside Blvd. over Indian Creek in Miami-Dade County, Florida. It was built in 1930, so it is 95 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 1,040 vehicles a day, roughly 2% of them trucks, projected to reach 1,530 by 2042. The structure is 360 ft (109.7 m) long and 40 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSurfside Blvd.
CrossesIndian Creek
Location0.5 Mile West of A1A
RouteCity Street 0
StateFlorida
Coordinates25.87792, -80.13047
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating26.3 US tons
Inventory rating15.8 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans13
Design loadHS 20
Structure length360 ft (109.7 m)
Longest span44 ft (13.3 m)
Deck width40 ft (12.3 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,040 (2024)
Projected traffic1,530 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was Surfside Blvd. over Indian Creek built?

It was built in 1930, making it 95 years old in 2025.

What condition is Surfside Blvd. over Indian Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Surfside Blvd. over Indian Creek carry?

About 1,040 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is Surfside Blvd. over Indian Creek?

The structure is 360 ft (109.7 m) long with a longest span of 44 ft (13.3 m) and a deck 40 ft wide.

Who owns Surfside Blvd. over Indian Creek?

It is owned by the City or Municipal Highway Agency.