SB SW 152nd Ave. over Canal C-103
GoodMiami-Dade County, Florida · 0.2 Mile S of SW312th St. · Structure no. 874311
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected May 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 102 ft
- 3 main spans
- Daily traffic
- 2,468
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
SB SW 152nd Ave. over Canal C-103 is a prestressed concrete slab carrying SB SW 152nd Ave. over Canal C-103 in Miami-Dade County, Florida. It was built in 1987, so it is 38 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,468 vehicles a day, roughly 1% of them trucks, projected to reach 3,893 by 2036. The structure is 102 ft (31.1 m) long and 40 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SB SW 152nd Ave. over Canal C-103 built?
It was built in 1987, making it 38 years old in 2025.
What condition is SB SW 152nd Ave. over Canal C-103 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does SB SW 152nd Ave. over Canal C-103 carry?
About 2,468 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is SB SW 152nd Ave. over Canal C-103?
The structure is 102 ft (31.1 m) long with a longest span of 34 ft (10.4 m) and a deck 40 ft wide.
Who owns SB SW 152nd Ave. over Canal C-103?
It is owned by the City or Municipal Highway Agency.