US Bridges

Port Boulevard WB over Port Boulevard EB

Good

Miami-Dade County, Florida · Port Boulevard · Structure no. 874090

Built
2004
21 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
285 ft
2 main spans
Daily traffic
29,752
2021 count
Owner
County
County Highway Agency

About this bridge

Port Boulevard WB over Port Boulevard EB is a prestressed concrete stringer/multi-beam or girder carrying Port Boulevard WB over Port Boulevard EB in Miami-Dade County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,752 vehicles a day, roughly 29% of them trucks, projected to reach 67,618 by 2041. The structure is 285 ft (86.9 m) long and 37 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPort Boulevard WB
CrossesPort Boulevard EB
LocationPort Boulevard
RouteCounty Highway 886
StateFlorida
Coordinates25.77637, -80.17479
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating54 US tons
Inventory rating49.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length285 ft (86.9 m)
Longest span143 ft (43.6 m)
Deck width37 ft (11.3 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,752 (2021)
Projected traffic67,618 by 2041
Trucks29%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Port Boulevard WB over Port Boulevard EB built?

It was built in 2004, making it 21 years old in 2025.

What condition is Port Boulevard WB over Port Boulevard EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Port Boulevard WB over Port Boulevard EB carry?

About 29,752 vehicles per day (2021 count), of which roughly 29% are trucks.

How long is Port Boulevard WB over Port Boulevard EB?

The structure is 285 ft (86.9 m) long with a longest span of 143 ft (43.6 m) and a deck 37 ft wide.

Who owns Port Boulevard WB over Port Boulevard EB?

It is owned by the County Highway Agency.