US Bridges

Central Blvd EB over Mia Utility Corr.

Good

Miami-Dade County, Florida · Miami Intl Airport · Structure no. 874013

Built
2012
13 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
87 ft
1 main span
Daily traffic
43,996
2024 count
Owner
Local
Other Local Agency

About this bridge

Central Blvd EB over Mia Utility Corr. is a prestressed concrete stringer/multi-beam or girder carrying Central Blvd EB over Mia Utility Corr. in Miami-Dade County, Florida. It was built in 2012, so it is 13 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 43,996 vehicles a day, roughly 9% of them trucks, projected to reach 51,549 by 2044. The structure is 87 ft (26.5 m) long and 75 ft wide.

CarriesCentral Blvd EB
CrossesMia Utility Corr.
LocationMiami Intl Airport
StateFlorida
Coordinates25.79443, -80.27001
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.1 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length87 ft (26.5 m)
Longest span87 ft (26.5 m)
Deck width75 ft (22.8 m)
Roadway width73 ft (22.1 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic43,996 (2024)
Projected traffic51,549 by 2044
Trucks9%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Central Blvd EB over Mia Utility Corr. built?

It was built in 2012, making it 13 years old in 2025.

What condition is Central Blvd EB over Mia Utility Corr. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Central Blvd EB over Mia Utility Corr. carry?

About 43,996 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Central Blvd EB over Mia Utility Corr.?

The structure is 87 ft (26.5 m) long with a longest span of 87 ft (26.5 m) and a deck 75 ft wide.

Who owns Central Blvd EB over Mia Utility Corr.?

It is owned by the Other Local Agency.