US Bridges

Busway Extension over Canal C-103N

Good

Miami-Dade County, Florida · 0.3MI. S of SW 264th ST · Structure no. 874001

Built
2007
18 years old
Condition
Good
inspected May 2023
Type
Tee Beam
Prestressed Concrete
Length
59 ft
3 main spans
Daily traffic
—
2023 count
Owner
County
County Highway Agency

About this bridge

Busway Extension over Canal C-103N is a prestressed concrete tee beam carrying Busway Extension over Canal C-103N in Miami-Dade County, Florida. It was built in 2007, so it is 18 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 59 ft (18.1 m) long and 58 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesBusway Extension
CrossesCanal C-103N
Location0.3MI. S of SW 264th ST
RouteCity Street 0
StateFlorida
Coordinates25.51681, -80.43069
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating77.4 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length59 ft (18.1 m)
Longest span29 ft (8.7 m)
Deck width58 ft (17.8 m)
Roadway width44 ft (13.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Busway Extension over Canal C-103N built?

It was built in 2007, making it 18 years old in 2025.

What condition is Busway Extension over Canal C-103N in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Busway Extension over Canal C-103N carry?

No traffic count is recorded for this structure.

How long is Busway Extension over Canal C-103N?

The structure is 59 ft (18.1 m) long with a longest span of 29 ft (8.7 m) and a deck 58 ft wide.

Who owns Busway Extension over Canal C-103N?

It is owned by the County Highway Agency.