US Bridges

WB SR 836 over NW 82 Ave.

Good

Miami-Dade County, Florida · WB SR 836 over NW 82 Ave. · Structure no. 871085

Built
2013
12 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
175 ft
2 main spans
Daily traffic
42,750
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

WB SR 836 over NW 82 Ave. is a prestressed concrete stringer/multi-beam or girder carrying WB SR 836 over NW 82 Ave. in Miami-Dade County, Florida. It was built in 2013, so it is 12 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 42,750 vehicles a day, roughly 4% of them trucks, projected to reach 74,171 by 2044. The structure is 175 ft (53.2 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWB SR 836
CrossesNW 82 Ave.
LocationWB SR 836 over NW 82 Ave.
RouteState Highway 836
StateFlorida
Coordinates25.78155, -80.32851
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.2 US tons
Inventory rating43.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length175 ft (53.2 m)
Longest span116 ft (35.3 m)
Deck width87 ft (26.5 m)
Roadway width84 ft (25.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,750 (2022)
Projected traffic74,171 by 2044
Trucks4%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB SR 836 over NW 82 Ave. built?

It was built in 2013, making it 12 years old in 2025.

What condition is WB SR 836 over NW 82 Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does WB SR 836 over NW 82 Ave. carry?

About 42,750 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is WB SR 836 over NW 82 Ave.?

The structure is 175 ft (53.2 m) long with a longest span of 116 ft (35.3 m) and a deck 87 ft wide.

Who owns WB SR 836 over NW 82 Ave.?

It is owned by the State Toll Authority.