NB SR 826 Ramp N-F over NW 7th Street
GoodMiami-Dade County, Florida · Ramp NB over NW 7th St. · Structure no. 871065
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 123 ft
- 1 main span
- Daily traffic
- 28,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
NB SR 826 Ramp N-F over NW 7th Street is a prestressed concrete stringer/multi-beam or girder carrying NB SR 826 Ramp N-F over NW 7th Street in Miami-Dade County, Florida. It was built in 2013, so it is 12 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,000 vehicles a day, roughly 4% of them trucks, projected to reach 48,580 by 2042. The structure is 123 ft (37.6 m) long and 60 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB SR 826 Ramp N-F over NW 7th Street built?
It was built in 2013, making it 12 years old in 2025.
What condition is NB SR 826 Ramp N-F over NW 7th Street in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does NB SR 826 Ramp N-F over NW 7th Street carry?
About 28,000 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is NB SR 826 Ramp N-F over NW 7th Street?
The structure is 123 ft (37.6 m) long with a longest span of 123 ft (37.6 m) and a deck 60 ft wide.
Who owns NB SR 826 Ramp N-F over NW 7th Street?
It is owned by the State Highway Agency.