US Bridges

Ebcd over SR 826 over SR 826

Good

Miami-Dade County, Florida · SR 826 & SR 836 Interchan · Structure no. 871054

Built
2013
12 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
515 ft
3 main spans
Daily traffic
32,930
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Ebcd over SR 826 over SR 826 is a prestressed concrete stringer/multi-beam or girder carrying Ebcd over SR 826 over SR 826 in Miami-Dade County, Florida. It was built in 2013, so it is 12 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 32,930 vehicles a day, roughly 6% of them trucks, projected to reach 43,600 by 2042. The structure is 515 ft (156.9 m) long and 55 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesEbcd over SR 826
CrossesSR 826
LocationSR 826 & SR 836 Interchan
RouteState Highway 836
StateFlorida
Coordinates25.78003, -80.32041
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating53.4 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length515 ft (156.9 m)
Longest span178 ft (54.2 m)
Deck width55 ft (16.8 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic32,930 (2023)
Projected traffic43,600 by 2042
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ebcd over SR 826 over SR 826 built?

It was built in 2013, making it 12 years old in 2025.

What condition is Ebcd over SR 826 over SR 826 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Ebcd over SR 826 over SR 826 carry?

About 32,930 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is Ebcd over SR 826 over SR 826?

The structure is 515 ft (156.9 m) long with a longest span of 178 ft (54.2 m) and a deck 55 ft wide.

Who owns Ebcd over SR 826 over SR 826?

It is owned by the State Toll Authority.