US Bridges

SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd

Good

Miami-Dade County, Florida · SR 826 SR 836 Interchange · Structure no. 871049

Built
2013
12 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
220 ft
1 main span
Daily traffic
21,500
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd is a steel continuous stringer/multi-beam or girder carrying SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd in Miami-Dade County, Florida. It was built in 2013, so it is 12 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,500 vehicles a day, roughly 8% of them trucks, projected to reach 37,302 by 2044. The structure is 220 ft (67.1 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 826 SB Off-Ramp
CrossesWB 836 Off - Ramp Cd
LocationSR 826 SR 836 Interchange
RouteState Highway 826
StateFlorida
Coordinates25.78214, -80.32308
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating95.9 US tons
Inventory rating74 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length220 ft (67.1 m)
Longest span220 ft (67.1 m)
Deck width44 ft (13.5 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,500 (2022)
Projected traffic37,302 by 2044
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd built?

It was built in 2013, making it 12 years old in 2025.

What condition is SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd carry?

About 21,500 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd?

The structure is 220 ft (67.1 m) long with a longest span of 220 ft (67.1 m) and a deck 44 ft wide.

Who owns SR 826 SB Off-Ramp over WB 836 Off - Ramp Cd?

It is owned by the State Toll Authority.