EB SR 836 over SR 969 / Milam Dairy RD
GoodMiami-Dade County, Florida · SR 826 & SR 836 Interchan · Structure no. 871040
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 223 ft
- 2 main spans
- Daily traffic
- 31,300
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
EB SR 836 over SR 969 / Milam Dairy RD is a prestressed concrete stringer/multi-beam or girder carrying EB SR 836 over SR 969 / Milam Dairy RD in Miami-Dade County, Florida. It was built in 2014, so it is 11 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 31,300 vehicles a day, roughly 5% of them trucks, projected to reach 40,250 by 2042. The structure is 223 ft (68.1 m) long and 82 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was EB SR 836 over SR 969 / Milam Dairy RD built?
It was built in 2014, making it 11 years old in 2025.
What condition is EB SR 836 over SR 969 / Milam Dairy RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does EB SR 836 over SR 969 / Milam Dairy RD carry?
About 31,300 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is EB SR 836 over SR 969 / Milam Dairy RD?
The structure is 223 ft (68.1 m) long with a longest span of 121 ft (36.8 m) and a deck 82 ft wide.
Who owns EB SR 836 over SR 969 / Milam Dairy RD?
It is owned by the State Toll Authority.