SR826 NB Ramp US27 over Miami Canal
GoodMiami-Dade County, Florida · 0.8 MI N of SR-934 · Structure no. 870976
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected May 2023
- Type
- Slab
- Concrete Continuous
- Length
- 119 ft
- 3 main spans
- Daily traffic
- 21,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR826 NB Ramp US27 over Miami Canal is a concrete continuous slab carrying SR826 NB Ramp US27 over Miami Canal in Miami-Dade County, Florida. It was built in 2006, so it is 19 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 21,000 vehicles a day, roughly 16% of them trucks, projected to reach 36,435 by 2044. The structure is 119 ft (36.2 m) long and 88 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR826 NB Ramp US27 over Miami Canal built?
It was built in 2006, making it 19 years old in 2025.
What condition is SR826 NB Ramp US27 over Miami Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does SR826 NB Ramp US27 over Miami Canal carry?
About 21,000 vehicles per day (2022 count), of which roughly 16% are trucks.
How long is SR826 NB Ramp US27 over Miami Canal?
The structure is 119 ft (36.2 m) long with a longest span of 46 ft (14 m) and a deck 88 ft wide.
Who owns SR826 NB Ramp US27 over Miami Canal?
It is owned by the State Highway Agency.