SR 90 (us 41) over Canal (sw 132 Ave)
GoodMiami-Dade County, Florida · E. of SW 132 Ave. · Structure no. 870963
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected September 2024
- Type
- Slab
- Concrete
- Length
- 73 ft
- 3 main spans
- Daily traffic
- 40,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR 90 (us 41) over Canal (sw 132 Ave) is a concrete slab carrying SR 90 (us 41) over Canal (sw 132 Ave) in Miami-Dade County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 40,500 vehicles a day, roughly 8% of them trucks, projected to reach 70,268 by 2044. The structure is 73 ft (22.4 m) long and 132 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 90 (us 41) over Canal (sw 132 Ave) built?
It was built in 2004, making it 21 years old in 2025.
What condition is SR 90 (us 41) over Canal (sw 132 Ave) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does SR 90 (us 41) over Canal (sw 132 Ave) carry?
About 40,500 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is SR 90 (us 41) over Canal (sw 132 Ave)?
The structure is 73 ft (22.4 m) long with a longest span of 28 ft (8.6 m) and a deck 132 ft wide.
Who owns SR 90 (us 41) over Canal (sw 132 Ave)?
It is owned by the State Highway Agency.