US Bridges

SR-826 (palmetto) over W 60th ST (nw 114th St)

Good

Miami-Dade County, Florida · 0.5MI. S of W 68th St. · Structure no. 870957

Built
2002
23 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
106 ft
1 main span
Daily traffic
29,500
2024 count
Owner
State
State Highway Agency

About this bridge

SR-826 (palmetto) over W 60th ST (nw 114th St) is a prestressed concrete stringer/multi-beam or girder carrying SR-826 (palmetto) over W 60th ST (nw 114th St) in Miami-Dade County, Florida. It was built in 2002, so it is 23 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,500 vehicles a day, roughly 3% of them trucks, projected to reach 51,182 by 2044. The structure is 106 ft (32.3 m) long and 198 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR-826 (palmetto)
CrossesW 60th ST (nw 114th St)
Location0.5MI. S of W 68th St.
RouteState Highway 826
StateFlorida
Coordinates25.877, -80.32333
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.8 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length106 ft (32.3 m)
Longest span106 ft (32.3 m)
Deck width198 ft (60.4 m)
Roadway width194 ft (59 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,500 (2024)
Projected traffic51,182 by 2044
Trucks3%
Lanes on structure13
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-826 (palmetto) over W 60th ST (nw 114th St) built?

It was built in 2002, making it 23 years old in 2025.

What condition is SR-826 (palmetto) over W 60th ST (nw 114th St) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SR-826 (palmetto) over W 60th ST (nw 114th St) carry?

About 29,500 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is SR-826 (palmetto) over W 60th ST (nw 114th St)?

The structure is 106 ft (32.3 m) long with a longest span of 106 ft (32.3 m) and a deck 198 ft wide.

Who owns SR-826 (palmetto) over W 60th ST (nw 114th St)?

It is owned by the State Highway Agency.