US Bridges

SR 821 Tpke over N/A

Good

Miami-Dade County, Florida · 0.78 MI N of SR 94 · Structure no. 870930

Built
1971
54 years old, rebuilt 2021
Condition
Good
inspected March 2023
Type
Culvert
Concrete
Length
26 ft
1 main span
Daily traffic
107,400
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 821 Tpke over N/A is a concrete culvert carrying SR 821 Tpke over N/A in Miami-Dade County, Florida. It was built in 1971 and reconstructed in 2021, so it is 54 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 107,400 vehicles a day, roughly 8% of them trucks, projected to reach 186,340 by 2042. The structure is 26 ft (7.9 m) long.

CarriesSR 821 Tpke
CrossesN/A
Location0.78 MI N of SR 94
RouteState Highway 821
StateFlorida
Coordinates25.6965, -80.38556
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.6 US tons
Inventory rating48.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length26 ft (7.9 m)
Longest span26 ft (7.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic107,400 (2023)
Projected traffic186,340 by 2042
Trucks8%
Lanes on structure11
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 821 Tpke over N/A built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2021.

What condition is SR 821 Tpke over N/A in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SR 821 Tpke over N/A carry?

About 107,400 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is SR 821 Tpke over N/A?

The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m).

Who owns SR 821 Tpke over N/A?

It is owned by the State Toll Authority.