US Bridges

SR826SB-US41EB over US-41 (SR-90)

Good

Miami-Dade County, Florida · 0.49MI S of SR-968 · Structure no. 870782

Built
2007
18 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
368 ft
7 main spans
Daily traffic
5,900
2024 count
Owner
State
State Highway Agency

About this bridge

SR826SB-US41EB over US-41 (SR-90) is a prestressed concrete stringer/multi-beam or girder carrying SR826SB-US41EB over US-41 (SR-90) in Miami-Dade County, Florida. It was built in 2007, so it is 18 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,900 vehicles a day, roughly 7% of them trucks, projected to reach 10,236 by 2042. The structure is 368 ft (112.3 m) long and 31 ft wide.

CarriesSR826SB-US41EB
CrossesUS-41 (SR-90)
Location0.49MI S of SR-968
RouteState Highway 826
StateFlorida
Coordinates25.76275, -80.32106
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.7 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans7
Design loadHL 93
Structure length368 ft (112.3 m)
Longest span56 ft (17.2 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,900 (2024)
Projected traffic10,236 by 2042
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR826SB-US41EB over US-41 (SR-90) built?

It was built in 2007, making it 18 years old in 2025.

What condition is SR826SB-US41EB over US-41 (SR-90) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR826SB-US41EB over US-41 (SR-90) carry?

About 5,900 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is SR826SB-US41EB over US-41 (SR-90)?

The structure is 368 ft (112.3 m) long with a longest span of 56 ft (17.2 m) and a deck 31 ft wide.

Who owns SR826SB-US41EB over US-41 (SR-90)?

It is owned by the State Highway Agency.