SR-826 SB (870779) over NW 25th Street
GoodMiami-Dade County, Florida · 2.4 MI N of US-41 · Structure no. 870778
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 137 ft
- 1 main span
- Daily traffic
- 19,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-826 SB (870779) over NW 25th Street is a prestressed concrete stringer/multi-beam or girder carrying SR-826 SB (870779) over NW 25th Street in Miami-Dade County, Florida. It was built in 2001, so it is 24 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,000 vehicles a day, roughly 2% of them trucks, projected to reach 32,965 by 2044. The structure is 137 ft (41.8 m) long and 98 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-826 SB (870779) over NW 25th Street built?
It was built in 2001, making it 24 years old in 2025.
What condition is SR-826 SB (870779) over NW 25th Street in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does SR-826 SB (870779) over NW 25th Street carry?
About 19,000 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is SR-826 SB (870779) over NW 25th Street?
The structure is 137 ft (41.8 m) long with a longest span of 137 ft (41.8 m) and a deck 98 ft wide.
Who owns SR-826 SB (870779) over NW 25th Street?
It is owned by the State Highway Agency.