SR 924 WB Off Ramp over Scl Railroad
GoodMiami-Dade County, Florida · At SR 953 WB Off Ramp · Structure no. 870742
- Built
- 1991
- 34 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 336 ft
- 4 main spans
- Daily traffic
- 6,300
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR 924 WB Off Ramp over Scl Railroad is a prestressed concrete stringer/multi-beam or girder carrying SR 924 WB Off Ramp over Scl Railroad in Miami-Dade County, Florida. It was built in 1991, so it is 34 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,300 vehicles a day, roughly 6% of them trucks, projected to reach 10,930 by 2044. The structure is 336 ft (102.4 m) long and 30 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 924 WB Off Ramp over Scl Railroad built?
It was built in 1991, making it 34 years old in 2025.
What condition is SR 924 WB Off Ramp over Scl Railroad in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does SR 924 WB Off Ramp over Scl Railroad carry?
About 6,300 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is SR 924 WB Off Ramp over Scl Railroad?
The structure is 336 ft (102.4 m) long with a longest span of 84 ft (25.6 m) and a deck 30 ft wide.
Who owns SR 924 WB Off Ramp over Scl Railroad?
It is owned by the State Toll Authority.