US Bridges

SR932 EB (870657) over Scl R/R

Good

Miami-Dade County, Florida · 0.5M E of NW 42 Ave · Structure no. 870722

Built
1960
65 years old, rebuilt 1991
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
308 ft
6 main spans
Daily traffic
19,750
2022 count
Owner
State
State Highway Agency

About this bridge

SR932 EB (870657) over Scl R/R is a prestressed concrete stringer/multi-beam or girder carrying SR932 EB (870657) over Scl R/R in Miami-Dade County, Florida. It was built in 1960 and reconstructed in 1991, so it is 65 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,750 vehicles a day, roughly 4% of them trucks, projected to reach 34,266 by 2044. The structure is 308 ft (93.9 m) long and 39 ft wide.

CarriesSR932 EB (870657)
CrossesScl R/R
Location0.5M E of NW 42 Ave
RouteState Highway 932
StateFlorida
Coordinates25.86744, -80.25992
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.2 US tons
Inventory rating37.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length308 ft (93.9 m)
Longest span74 ft (22.6 m)
Deck width39 ft (11.9 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,750 (2022)
Projected traffic34,266 by 2044
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR932 EB (870657) over Scl R/R built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1991.

What condition is SR932 EB (870657) over Scl R/R in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR932 EB (870657) over Scl R/R carry?

About 19,750 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is SR932 EB (870657) over Scl R/R?

The structure is 308 ft (93.9 m) long with a longest span of 74 ft (22.6 m) and a deck 39 ft wide.

Who owns SR932 EB (870657) over Scl R/R?

It is owned by the State Highway Agency.