SR821 Rmpto I-75NB over SR-821/I-75
FairMiami-Dade County, Florida · 0.5MI S Broward Co.Line · Structure no. 870602
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected September 2024
- Type
- Segmental Box Girder
- Prestressed Concrete Continuous
- Length
- 2,116 ft
- 11 main spans
- Daily traffic
- 16,500
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR821 Rmpto I-75NB over SR-821/I-75 is a prestressed concrete continuous segmental box girder carrying SR821 Rmpto I-75NB over SR-821/I-75 in Miami-Dade County, Florida. It was built in 1984, so it is 41 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,500 vehicles a day, roughly 12% of them trucks, projected to reach 28,628 by 2044. The structure is 2,116 ft (644.9 m) long and 43 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR821 Rmpto I-75NB over SR-821/I-75 built?
It was built in 1984, making it 41 years old in 2025.
What condition is SR821 Rmpto I-75NB over SR-821/I-75 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SR821 Rmpto I-75NB over SR-821/I-75 carry?
About 16,500 vehicles per day (2024 count), of which roughly 12% are trucks.
How long is SR821 Rmpto I-75NB over SR-821/I-75?
The structure is 2,116 ft (644.9 m) long with a longest span of 222 ft (67.8 m) and a deck 43 ft wide.
Who owns SR821 Rmpto I-75NB over SR-821/I-75?
It is owned by the State Highway Agency.