US Bridges

SR854 EB (870576) over Scl R/R

Good

Miami-Dade County, Florida · W of I-95 · Structure no. 870577

Built
1970
55 years old, rebuilt 1995
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
197 ft
4 main spans
Daily traffic
34,000
2024 count
Owner
State
State Highway Agency

About this bridge

SR854 EB (870576) over Scl R/R is a prestressed concrete stringer/multi-beam or girder carrying SR854 EB (870576) over Scl R/R in Miami-Dade County, Florida. It was built in 1970 and reconstructed in 1995, so it is 55 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,000 vehicles a day, roughly 12% of them trucks, projected to reach 58,990 by 2042. The structure is 197 ft (60 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR854 EB (870576)
CrossesScl R/R
LocationW of I-95
RouteState Highway 854
StateFlorida
Coordinates25.96417, -80.16673
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40.7 US tons
Inventory rating31.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length197 ft (60 m)
Longest span61 ft (18.6 m)
Deck width82 ft (25 m)
Roadway width52 ft (15.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,000 (2024)
Projected traffic58,990 by 2042
Trucks12%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR854 EB (870576) over Scl R/R built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1995.

What condition is SR854 EB (870576) over Scl R/R in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR854 EB (870576) over Scl R/R carry?

About 34,000 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is SR854 EB (870576) over Scl R/R?

The structure is 197 ft (60 m) long with a longest span of 61 ft (18.6 m) and a deck 82 ft wide.

Who owns SR854 EB (870576) over Scl R/R?

It is owned by the State Highway Agency.