SR821 NB Heft 25.6 over Snapper Creek Canal C-2
GoodMiami-Dade County, Florida · 0.1 MI S of US-41 · Structure no. 870516
- Built
- 1977
- 48 years old, rebuilt 1992
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 155 ft
- 3 main spans
- Daily traffic
- 12,550
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR821 NB Heft 25.6 over Snapper Creek Canal C-2 is a prestressed concrete stringer/multi-beam or girder carrying SR821 NB Heft 25.6 over Snapper Creek Canal C-2 in Miami-Dade County, Florida. It was built in 1977 and reconstructed in 1992, so it is 48 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,550 vehicles a day, roughly 6% of them trucks, projected to reach 21,774 by 2042. The structure is 155 ft (47.2 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR821 NB Heft 25.6 over Snapper Creek Canal C-2 built?
It was built in 1977, making it 48 years old in 2025. It was reconstructed in 1992.
What condition is SR821 NB Heft 25.6 over Snapper Creek Canal C-2 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does SR821 NB Heft 25.6 over Snapper Creek Canal C-2 carry?
About 12,550 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is SR821 NB Heft 25.6 over Snapper Creek Canal C-2?
The structure is 155 ft (47.2 m) long with a longest span of 54 ft (16.5 m) and a deck 46 ft wide.
Who owns SR821 NB Heft 25.6 over Snapper Creek Canal C-2?
It is owned by the State Toll Authority.