I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv
FairMiami-Dade County, Florida · Downtown Intrchg · Structure no. 870479
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 2,885 ft
- 4 main spans
- Daily traffic
- 21,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv is a steel continuous stringer/multi-beam or girder carrying I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv in Miami-Dade County, Florida. It was built in 1969, so it is 56 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,000 vehicles a day, roughly 8% of them trucks, projected to reach 36,435 by 2044. The structure is 2,885 ft (879.3 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv built?
It was built in 1969, making it 56 years old in 2025.
What condition is I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv carry?
About 21,000 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv?
The structure is 2,885 ft (879.3 m) long with a longest span of 200 ft (61 m) and a deck 26 ft wide.
Who owns I-95 SB to US-41 over SW6th ST-NW2nd ST Mia Rv?
It is owned by the State Highway Agency.