US Bridges

SR 874 SB over Canal C-100

Good

Miami-Dade County, Florida · 350 Ft. N of SR 821 (tpk) · Structure no. 870458

Built
1973
52 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
59,000
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 874 SB over Canal C-100 is a prestressed concrete stringer/multi-beam or girder carrying SR 874 SB over Canal C-100 in Miami-Dade County, Florida. It was built in 1973, so it is 52 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 59,000 vehicles a day, roughly 7% of them trucks, projected to reach 102,365 by 2044. The structure is 120 ft (36.6 m) long and 80 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 874 SB
CrossesCanal C-100
Location350 Ft. N of SR 821 (tpk)
RouteState Highway 874
StateFlorida
Coordinates25.65119, -80.38392
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width80 ft (24.3 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic59,000 (2024)
Projected traffic102,365 by 2044
Trucks7%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 874 SB over Canal C-100 built?

It was built in 1973, making it 52 years old in 2025.

What condition is SR 874 SB over Canal C-100 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR 874 SB over Canal C-100 carry?

About 59,000 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is SR 874 SB over Canal C-100?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 80 ft wide.

Who owns SR 874 SB over Canal C-100?

It is owned by the State Toll Authority.