US Bridges

I-95 over 119th ST (SR-924)

Good

Miami-Dade County, Florida · 2.1 MI S of SR-826 · Structure no. 870437

Built
1962
63 years old, rebuilt 1991
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
168 ft
3 main spans
Daily traffic
264,000
2024 count
Owner
State
State Highway Agency

About this bridge

I-95 over 119th ST (SR-924) is a prestressed concrete stringer/multi-beam or girder carrying I-95 over 119th ST (SR-924) in Miami-Dade County, Florida. It was built in 1962 and reconstructed in 1991, so it is 63 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 264,000 vehicles a day, roughly 5% of them trucks, projected to reach 458,040 by 2042. The structure is 168 ft (51.2 m) long and 175 ft wide.

CarriesI-95
Crosses119th ST (SR-924)
Location2.1 MI S of SR-826
RouteInterstate 95
StateFlorida
Coordinates25.88383, -80.20906
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45 US tons
Inventory rating32 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length168 ft (51.2 m)
Longest span84 ft (25.6 m)
Deck width175 ft (53.2 m)
Roadway width169 ft (51.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic264,000 (2024)
Projected traffic458,040 by 2042
Trucks5%
Lanes on structure12
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 over 119th ST (SR-924) built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1991.

What condition is I-95 over 119th ST (SR-924) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does I-95 over 119th ST (SR-924) carry?

About 264,000 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is I-95 over 119th ST (SR-924)?

The structure is 168 ft (51.2 m) long with a longest span of 84 ft (25.6 m) and a deck 175 ft wide.

Who owns I-95 over 119th ST (SR-924)?

It is owned by the State Highway Agency.