SR821 NB Heft 1.35 over SW 328 ST
GoodMiami-Dade County, Florida · 1.0 Mi. N of US-1 · Structure no. 870399
- Built
- 1974
- 51 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 297 ft
- 4 main spans
- Daily traffic
- 23,900
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR821 NB Heft 1.35 over SW 328 ST is a prestressed concrete stringer/multi-beam or girder carrying SR821 NB Heft 1.35 over SW 328 ST in Miami-Dade County, Florida. It was built in 1974, so it is 51 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 23,900 vehicles a day, roughly 6% of them trucks, projected to reach 41,466 by 2042. The structure is 297 ft (90.6 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR821 NB Heft 1.35 over SW 328 ST built?
It was built in 1974, making it 51 years old in 2025.
What condition is SR821 NB Heft 1.35 over SW 328 ST in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does SR821 NB Heft 1.35 over SW 328 ST carry?
About 23,900 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is SR821 NB Heft 1.35 over SW 328 ST?
The structure is 297 ft (90.6 m) long with a longest span of 85 ft (25.9 m) and a deck 43 ft wide.
Who owns SR821 NB Heft 1.35 over SW 328 ST?
It is owned by the State Toll Authority.