US Bridges

I-95 over Ramp 112/195 EB - 95 NB

Good

Miami-Dade County, Florida · I-95/SR112/I-195 Intrchg · Structure no. 870327

Built
1959
66 years old, rebuilt 1988
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
248 ft
3 main spans
Daily traffic
179,000
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 over Ramp 112/195 EB - 95 NB is a prestressed concrete stringer/multi-beam or girder carrying I-95 over Ramp 112/195 EB - 95 NB in Miami-Dade County, Florida. It was built in 1959 and reconstructed in 1988, so it is 66 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 179,000 vehicles a day, roughly 5% of them trucks, projected to reach 310,565 by 2044. The structure is 248 ft (75.7 m) long and 163 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-95
CrossesRamp 112/195 EB - 95 NB
LocationI-95/SR112/I-195 Intrchg
RouteInterstate 95
StateFlorida
Coordinates25.81434, -80.20609
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.8 US tons
Inventory rating33.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length248 ft (75.7 m)
Longest span112 ft (34.1 m)
Deck width163 ft (49.7 m)
Roadway width153 ft (46.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic179,000 (2022)
Projected traffic310,565 by 2044
Trucks5%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 over Ramp 112/195 EB - 95 NB built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1988.

What condition is I-95 over Ramp 112/195 EB - 95 NB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I-95 over Ramp 112/195 EB - 95 NB carry?

About 179,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is I-95 over Ramp 112/195 EB - 95 NB?

The structure is 248 ft (75.7 m) long with a longest span of 112 ft (34.1 m) and a deck 163 ft wide.

Who owns I-95 over Ramp 112/195 EB - 95 NB?

It is owned by the State Highway Agency.