SR-826 over SR-823 (nw 57th Ave.)
FairMiami-Dade County, Florida · 3MI W of SR-817 · Structure no. 870253
- Built
- 1963
- 62 years old, rebuilt 1978
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 168 ft
- 4 main spans
- Daily traffic
- 149,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-826 over SR-823 (nw 57th Ave.) is a prestressed concrete stringer/multi-beam or girder carrying SR-826 over SR-823 (nw 57th Ave.) in Miami-Dade County, Florida. It was built in 1963 and reconstructed in 1978, so it is 62 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 149,500 vehicles a day, roughly 6% of them trucks, projected to reach 259,382 by 2044. The structure is 168 ft (51.2 m) long and 111 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-826 over SR-823 (nw 57th Ave.) built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1978.
What condition is SR-826 over SR-823 (nw 57th Ave.) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does SR-826 over SR-823 (nw 57th Ave.) carry?
About 149,500 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR-826 over SR-823 (nw 57th Ave.)?
The structure is 168 ft (51.2 m) long with a longest span of 52 ft (15.8 m) and a deck 111 ft wide.
Who owns SR-826 over SR-823 (nw 57th Ave.)?
It is owned by the State Highway Agency.