Ives Dairy RD over Snake Creek Canal C-9
GoodMiami-Dade County, Florida · 0.1MI East of N Miami Ave · Structure no. 870168
- Built
- 1972
- 53 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 282 ft
- 6 main spans
- Daily traffic
- 40,500
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Ives Dairy RD over Snake Creek Canal C-9 is a prestressed concrete stringer/multi-beam or girder carrying Ives Dairy RD over Snake Creek Canal C-9 in Miami-Dade County, Florida. It was built in 1972, so it is 53 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 40,500 vehicles a day, roughly 6% of them trucks, projected to reach 62,394 by 2043. The structure is 282 ft (86.1 m) long and 98 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ives Dairy RD over Snake Creek Canal C-9 built?
It was built in 1972, making it 53 years old in 2025.
What condition is Ives Dairy RD over Snake Creek Canal C-9 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Ives Dairy RD over Snake Creek Canal C-9 carry?
About 40,500 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is Ives Dairy RD over Snake Creek Canal C-9?
The structure is 282 ft (86.1 m) long with a longest span of 48 ft (14.5 m) and a deck 98 ft wide.
Who owns Ives Dairy RD over Snake Creek Canal C-9?
It is owned by the County Highway Agency.