SR 836 WB over Lawrence Waterway
GoodMiami-Dade County, Florida · At 17th Avenue WB on Ramp · Structure no. 870146
- Built
- 1968
- 57 years old, rebuilt 2018
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 77 ft
- 1 main span
- Daily traffic
- 151,300
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR 836 WB over Lawrence Waterway is a prestressed concrete stringer/multi-beam or girder carrying SR 836 WB over Lawrence Waterway in Miami-Dade County, Florida. It was built in 1968 and reconstructed in 2018, so it is 57 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 151,300 vehicles a day, roughly 4% of them trucks, projected to reach 180,500 by 2044. The structure is 77 ft (23.5 m) long and 100 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 836 WB over Lawrence Waterway built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2018.
What condition is SR 836 WB over Lawrence Waterway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does SR 836 WB over Lawrence Waterway carry?
About 151,300 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is SR 836 WB over Lawrence Waterway?
The structure is 77 ft (23.5 m) long with a longest span of 77 ft (23.5 m) and a deck 100 ft wide.
Who owns SR 836 WB over Lawrence Waterway?
It is owned by the State Toll Authority.